Pages

IELTS Writing Task 1: Bài mẫu Map về "Road Tunnels"



The diagrams below give information about two road tunnels in two cities in Australia.
The diagrams illustrate two different underground tunnel systems for automobiles in two Australian cities.

Overall, the two tunnel systems have a great number of differences in terms of the costs, size, length, time of construction and the surrounding geology. It 
is clear that the second tunnel was significantly more outstanding than the first one.

The first tunnel, which took 12 years to be completely constructed, cost 555 million dollars. On the other hand, the second tunnel took only 4 years to complete but required twice as much as the construction costs of the first tunnel, at 1.1 million dollars. The first tunnel system was built underneath bodies of water and sand, while there was a composition of stone and clay lying on the top of the second system.

According to the size, the first tunnel infrastructure is smaller, at 1,5 meters high and 2,2 kilometers long compared to 2,5 meters and 3,6 kilometers of the second infrastructure’s height and length respectively. The second tunnel also has more lanes, constituting a total of 6 lanes, while the first one only has four-lane roads.


(186 words)


Nate on IELTS

Phasellus facilisis convallis metus, ut imperdiet augue auctor nec. Duis at velit id augue lobortis porta. Sed varius, enim accumsan aliquam tincidunt, tortor urna vulputate quam, eget finibus urna est in augue.

No comments:

Post a Comment